РАЗРАБОТКА ИМПОРТОЗАМЕЩАЮЩЕЙ ТЕХНОЛОГИИ И ОСВОЕНИЕ ПРОИЗВОДСТВА СТАЛЬНЫХ ТРУБ ДЛЯ ТОПЛИВОПРОВОДОВ ВЫСОКОГО ДАВЛЕНИЯ

Андрей Васильевич Серебряков, В. А. Моргунов, И. Н. Бажуков, С. Г. Комельских, Александр Васильевич Серебряков, Станислав Иванович Паршаков

Resultado de la investigación: Articlerevisión exhaustiva

Resumen

The import-replacement technology for the production of steel pipes for fuel injection pipelines has been developed and implemented in accordance with GOST R ISO 8535-1—2017. Study results intended for checking the compliance of the inner diameter, the mechanical properties, and quality of the internal surface of the pipes with the requirements of GOST R ISO 8535-1—2017 are presented. It is shown that the pipes manufactured by the new technology meet the requirements of GOST R ISO 8535-1—2017.
Título traducido de la contribuciónDevelopment of import-replacement technology and implementation of steel pipe production for fuel injection pipelines
Idioma originalRussian
Páginas (desde-hasta)3-7
PublicaciónПроизводство проката
N.º1
DOI
EstadoPublished - 2019

GRNTI

  • 53.47.00

Level of Research Output

  • VAK List

Huella

Profundice en los temas de investigación de 'РАЗРАБОТКА ИМПОРТОЗАМЕЩАЮЩЕЙ ТЕХНОЛОГИИ И ОСВОЕНИЕ ПРОИЗВОДСТВА СТАЛЬНЫХ ТРУБ ДЛЯ ТОПЛИВОПРОВОДОВ ВЫСОКОГО ДАВЛЕНИЯ'. En conjunto forman una huella única.

Citar esto