Instrument ofthe work breakdown accounting in the high-tech production

科研成果: Conference article

源语言English
文章编号012094
期刊IOP Conference Series: Materials Science and Engineering
966
1
DOI
Published - 十一月 2020
活动15th International Conference on Industrial Manufacturing and Metallurgy, ICIMM 2020 - Nizhny Tagil, Russian Federation
期限: 18 六月 202019 六月 2020

ASJC Scopus subject areas

  • Materials Science(all)
  • Engineering(all)

指纹 探究 'Instrument ofthe work breakdown accounting in the high-tech production' 的科研主题。它们共同构成独一无二的指纹。

引用此